On Wednesday, the Keystone XL Pipeline project, which was first proposed in 2008, stalled by former President Barack Obama, resurrected by former President Trump, and then finally killed by President Biden, was terminated by TC Energy, the Canadian developer of the project, in the process costing Americans thousands of jobs.
The pipeline would have transported over 800,000 barrels of oil a day from Alberta, Canada, through Nebraska to refineries on the Texas Gulf Coast.

.png)
.png)

